ORBYM : Step-by-Step Guide to ORBYM (Orebody Movement) for 3D Blast Simulation in Strayos

ORBYM : Step-by-Step Guide to ORBYM (Orebody Movement) for 3D Blast Simulation in Strayos

Step-by-Step Guide to ORBYM Blast Simulation in Strayos


What is ORBYM

ORBYM (Ore Body Movement) modelling is a powerful tool to simulate how the rock mass moves during a blast and where every part of the ore body ends up afterwards. It combines AI-predicted blast energy with a physics-based (DEM) simulation, and it carries your block model through the blast so each particle keeps its ore or waste identity. Use this feature to plan blasts and understand ore distribution for maximized recovery.

The result is a 3D playback of the muckpile and a post-blast surface you can use for planning.

Idea

Why it is important

A blast moves ore. Material from different grade zones mixes and shifts, so the pre-blast block model no longer matches what is in the muckpile. Digging against the pre-blast map causes ore loss and dilution.

ORBYM shows the post-blast position of ore and waste before the shovel starts. With it you can:

  • Plan selective digging against the real muckpile instead of the pre-blast block model
  • Spot ore loss and dilution risk early and adjust the blast design
  • Check throw and muckpile shape for the area in front of the face
  • Export the post-blast surface for use in mine planning software

How it works

ORBYM runs in four stages once you save a simulation:

1.      ORBYM Physics Informed AI Model predicts the blast energy. ORBYM AI model estimates burden velocity, equilibrium pressure and crushed zone radius from your drill design, loading plan, timing plan and rock properties. simulation uses that energy as its starting condition and moves the rock particles through the blast.

2.      The block model is tagged onto the particles. If you select a block model, every particle keeps its ore or waste grade through the simulation.

3.      You review the result. Play back the 3D ore body movement, colour particles by block property, and view or download the post-blast surface.

Before you start

You need three plans completed for the blast you want to simulate:

  • Drill design
  • Loading plan
  • Timing plan

Check the loading plan: when you toggle on the specific energy visualization, it must show a colour map with specific energy values. If it does not, finish the loading plan before running ORBYM.

Notes

Keep these rock mass properties ready:

  1. Poisson's ratio - Rockmass elastic property
  2. Tensile strength
  3. Density

InfoOptional: upload your block model in the Block Model section first if you want ore grades and waste tracked through the simulation.


Step 1: Complete the Pre-Blast Plans

Have your drill design, loading plan, and timing plan fully completed for the blast you want to simulate.

Check the drill design

Step 2: Check the Loading Plan Visualization

Check if the loading plan is up and ready. If it is not, do the loading plan properly.

Turn on the Specific Energy visualization. You should see a color map showing your plan is set. If not, complete the loading plan first.

Step 3: Review Timing Plans

Confirm that timing plan is finished and all holes are fully connected with timing delays displayed for each hole.

Step 4: Go to ORBYM in Drill & Blast Section

In the Drill and Blast section, select ORBYM.

Step 5: Start a New Simulation and Define the Area of Interst

Click New Simulation on the top to begin setting up ORBYM simulation. Draw your area of interest. This area should cover the blast plan and the front “free face” where the material will move. Include enough room to capture the entire throw of the muckpile.

Step 6: Enter Rock Mass Details

Input rock mass properties such as Density, Poisson’s ratio, and Young’s modulus.

Step 7: (Optional) Select a Block Model

If you have a block model uploaded, toggle on Block Model, then select your desired block model.

Step 8: Save and Name Your Simulation

Click Save, give your simulation a name, then confirm to start the simulation.

Step 9: Monitor Simulation Status

Once complete, your simulation will show up in the Simulation History. Click Play to view the 3D simulation.


Adjusting the ORBYM Simulation Views, Color the Particles and Exporting the Post-Blast Surface

# Adjust Visualization Layers for Target Area viewing

Under Layers, choose to hidden option in the terrain to show only the area of interest for targeted analysis.

# Color Particles by Elevation

Access Simulation Settings to view the particle colors by elevation, heat, mono, or depth.

# Color Particles by Block Model

Toggle to color particles by block model ID to view based on block ID

Toggle the Block Properties in Block Model to view the colors based on specific block property condition (ex. CaO).

Set the threshold limits for visual clarity and select your preferred color options. Click Done to update. Reply the simulation to study dilution and ore movement in detail.

# View and Download Post-Blast Surface

Use the Show Post Surface option to see the surface after blasting. Download as DXF or OPJ files for further use.

# Compare Post-blast surfaces of two Simulations

If you’ve run multiple simulations, use the Compare feature to evaluate output differences between 2 simulations.


Conclusion

ORBYM - Ore body movement modeling is a robust tool for drill and blast planning. Always double-check drill, loading, and timing designs, as well as rock properties, before running a simulation - simulation outcomes rely directly on the accuracy of this data.

Confirm all parameters, run your simulation, and use ORBYM visualization tools wisely to gain insights that drive better decision-making.