How to link post blast project with pre blast project?

How to link post blast project with pre blast project?

There are two ways to link the pre-blast with post-blast data.
A. Before uploading post-blast images
1. Before uploading post-blast data in the software, need to toggle on the post-blast Fragmentation and Muckpile AI tab. 
2. Select the Pre-blast project from the drop-down menu.

B. After processing post-blast images
1. Select the Link the pre-blast project tab after selecting three dots.



2. After that, select the pre-blast project name to link with the post-blast project.