Save time by duplicating Shotplan design pattern across multiple projects.
Shotplan pattern from a previous projects can easily be used as a starting point for your latest shot design project.
"Copy to another project" feature avoids the need to repeat the pattern creation every time on a new project.
Copy Shotplan to a new project
You can copy the shotplan data to any specific map using "Copy to another project" feature.
The entire pattern of the copied shotplan will appear at the exact same coordinates on the dataset it was copied to. You can also adjust pattern to a specific position after the pattern is copied.
How to copy Shotplan pattern to another project
1. Open the project, load your shotplan and the click on copy to another project icon next to Shotplan header.
2. select the name of the project you want to copy the shotplan pattern to → Copy.
3. A copy of the shotplan will now be available on the selected project.
Open the Destination project to verify the results
Comments
0 comments
Please sign in to leave a comment.